| |
 |
| |
| 4) Renovation tile walls cool room and meat preparation room supermarket. |
 |
| |
| Application: Renovation of old cool storage and meat preparation room for a meat department of a supermarket. The tile walls and joints were damaged and contaminated. Roof in bad condition. |
| |
| Before renovation |
|
| After renovation |
|
Used Materials:
- ABC-Hygienic FRP Smooth panel with 10 mm polypropylene mechanically fixed with omega profile, round corner profile and curbs.
- OP 20 Polyester quartzite curbs as protection against small trolleys. |
| |
|
|
 |
|
|