| 3) Renovation brick wall of cool room – Vegetable-processing plant. |
 |
| |
| Application: Cool room for storage peeled potatoes was to be modified following new HACCP standards.The ABC-Hygienic Renopanel is installed direct on the brick wall by using the omega profile and ABC-Hygienic Hard Fix Glue. To protect the walls against the bin traffic our polyester quartzite curbs are installed in front of the Renopanels |
| |
| Before renovation |
|
| After renovation |
|
Used materials:
- ABC-Hygienic Renopanel Embossed mechanically fixed with Omega connection profile and ABC-Hygienic Hard Fix Glue profile and round corner profile.
- OP 30 Polyester quartzite curbs as protection against crates traffic |
| |
|